| Newport
News Development Fees - Effective July 1, 2008 |
 |
| Subdivision Fees |
| -----Preliminary Plan Filing Fee |
$250.00, plus $10.00 per lot |
| -----Development Plan Filing Fee |
$400.00, plus $30.00 per lot |
| -----Resubmittal Fee |
$275.00 |
| -----Phase Filing Fee |
$100.00 |
| -----Inspection Fee Schedule |
$250.00, plus # of units X unit cost X 1.8% |
| Site Plan Fees |
| -----Filing Fee |
$375.00, plus $130.00 per acre |
| -----Inspection Fee |
$125.00, plus $125.00 per acre |
| -----Revised Plan Filing Fee |
$250.00 |
| -----Revised Plan Filing Fee (phased or altered) |
$100.00 |
| -----Plat Filing Fee |
$200.00, plus $25.00 per lot; plus $640.00 (printing and recordation of 30 sheets) |
| Land Disturbance Permit |
| -----Less than 2,500 square feet: |
No charge |
| -----2,500-10,000 square feet: |
$175.00 |
| -----10,001-20,000 square feet: |
$225.00 |
| -----20,001-30,000 square feet: |
$275.00 |
| -----30,001-40,000 square feet: |
$300.00 |
| -----40,001-50,000 square feet: |
$325.00 |
| -----More than 50,001 square feet: |
$350.00 plus $25.00 for square footage in excess of 60,000 square feet (in increments of 10,000 square feet or portion thereof) |
| Open Burning Permit |
$25.00 per acre |
| Reinstatement Fee |
$50.00 |
| Right-of-way Permit |
$100,000 public liability insurance holding City harmless; performance bond equal to cost of right-of-way construction, $5,000.00 minimum.
Residential entrance: $65.00
Commercial entrance: $200.00 |
| Building Plans, Review Fee |
| -----2,499 square feet |
$30.00 |
| -----2,500 - 4,999 square feet |
$55.00 |
| -----5,000+ square feet |
$110.00 |
| Building Permits |
|
| -----Construction Permit Residential |
0.44% x 88% of BOCA-established cost ($55.00
minimum) |
| -----Non-Residential |
0.48% x 88% of BOCA-established cost ($55.00
minimum) |
| Plumbing Permit |
$10.00 per fixture; $15.00 per water distribution
system or building drain connection; $30.00 per sewer
connection, manhole, roof drain or area drain; $50.00
per gas line or medical gas line ($55.00 minimum) |
| Electrical Permit |
| -----Service Panels |
| -----Amperes |
Charge |
| -----0-125 |
$55.00 single-phase/ $85.00
three-phase |
| -----126-150 |
$85.00 single-phase/ $110.00 three-phase |
| -----151-200 |
$110.00 single-phase/ $165.00 three-phase |
| -----Over 200 |
$165.00 single-phase/ $195.00 three-phase,
plus $30.00 for each additional 50 amperes or fraction
thereof |
| Temporary Service |
$50.00 |
| Mechanical Permit |
| -----Residential |
0.44% installation and materials cost ($55.00
minimum) |
| -----Non-Residential |
0.48% installation and materials cost ($55.00
minimum) |
| Elevator Operating Permits |
| -----Semi-annual inspection |
$50.00 |
| -----Maintenance inspection |
$85.00 |
| Sign Permit |
2% installation and materials ($50.00 minimum/$252.50 maximum) |
| Utility Reset Inspection Fee |
$35.00 |
| Alteration or Repair Permit |
| -----Residential |
0.44% construction cost ($55.00
minimum) |
| -----Non-Residential |
0.48% construction cost ($55.00
minimum) |
| Demolition Permit |
|
| -----0-250 s.f. |
$40.00 |
| -----250 s.f. or more |
$100.00 |
| Temporary Certificate of Occupancy |
$55.00 |
| NOTE: There is a state surcharge of 1% of the permit fee for all building, electrical, plumbing and mechanical permits. |
|
 |
| Water Connection Fees |
| Tap and Pipe Size |
Charge |
Reduced Charge* |
| 1/2" tap, 3/4" pipe |
$690.00 |
$285.00 |
| 3/4" tap, 3/4" pipe |
$715.00 |
$300.00 |
| 1" tap, 1-1/2" pipe |
$800.00 |
$360.00 |
| 1-1/4" tap, 1-1/2" pipe |
$1,700.00 |
$610.00 |
| 2" tap, 2" pipe |
$1,900.00 |
$700.00 |
| Larger than 2" Service |
Actual cost + 10% |
Actual cost + 10% |
*Reduced charges where service pipeline installation is performed by the applicant in conjunction with a water pipeline extension agreement. |
| NOTE: Required permit and street repair charges additional |
|
 |
| Water System Development Charge |
| Meter Size |
Charge |
| 5/8" |
$1,450.00 |
| 3/4" |
$2,175.00 |
| 1" |
$3,625.00 |
| 1-1/2" |
$12,325.00 |
| 2" |
$16,675.00 |
| 3" |
$38,715.00 |
| 4" |
$90,625.00 |
| 6" |
$191,400.00 |
| 8" |
$314,215.00 |
| 10" |
$502,715.00 |
| Sewer Connection Fee |
| -----Commercial |
$547.00, plus $383.00 for each
additional lateral, plus $44 per linear foot (frontage) |
| -----Industrial |
$547.00, plus $44 per linear foot (frontage) |
| -----Hotels |
$383.00, plus $44 per linear foot (frontage) |
| -----Multifamily |
$383.00, plus $44 per linear foot (frontage) |
| Wastewater Facility Charge (Hampton Roads Sanitation District - HRSD) |
| Meter Size |
|
| 5/8" |
$1,540.00 |
| 3/4" |
$2,340.00 |
| 1" |
$4,350.00 |
| 1-1/2" |
$10,565.00 |
| 2" |
$19,785.00 |
| 3" |
$47,920.00 |
| 4" |
$89,830.00 |
| 6" |
$217,710.00 |
| 8" |
$407,870.00 |
| 10" |
$663,890.00 |
| Charges and fees are those commonly applicable to businesses in Newport News. The foregoing list may not include specialized circumstances. |
|
| |